UAS MARQUEE
Round Luxury Event Venue · Islamabad
Fusion Developers (Pvt) Ltd
Premium Architecture · Engineering · Construction · Project Development
Client Proposal — August 2026
FUSION DEVELOPERS
Project Overview

A Round Marquee, Engineered

165 ft

Diameter

Perfect circular plan, radius 82.5 ft

21,237

sq ft

Covered floor area

24

Columns

20 perimeter + 4 internal + mast

35 ft

Apex

Conical roof from 20 ft eaves

A landmark circular event venue for Islamabad — radial steel frame, masonry-and-glass envelope, and a dramatic 35 ft conical crown. Designed, engineered and delivered by Fusion Developers to international EPC standards.

FUSION DEVELOPERS
Concept & Design Language

Lebanese Luxury, Fusion Precision

Facade-language reference — grand double-height lobby, dome concealed behind parapet.

Geometry

Monumental circular form with a single soaring apex — a modern shamiana reinterpreted for 1,500 guests.

Palette

Gold #C9A84C · Indigo #1B2A4A · Cream #F5F0E1 · Warm Brown #8B7355

Envelope

Solid brick base grounding the form; glazed upper band for daylight and evening glow.

Round typologyConical crownGold + IndigoBanquet 1500Lebanese luxury
FUSION DEVELOPERS
3D Visualization

See It Before We Build It

Exterior — round marquee at dusk

Interior — banquet set, 165' round

Visual references from a comparable completed round-marquee venue. Interactive 3D model: uas-marquee.pages.dev

FUSION DEVELOPERS
Spatial Planning

Round Floor Plan

Layout

Central clear-span rotunda framed by 20 perimeter columns. 4 internal king-post columns support the central ring/mast. Grand entrance foyers on primary axes.

Capacity

Banquet: 1,500 · Theatre: 2,200 · Reception: 2,800

Aerial site context

FUSION DEVELOPERS
Structural System

Radial-Frame Marquee (Round PEB)

Load Path

20 radial rafters thrust to perimeter columns; apex converges on a central ring/mast. Pin-type eave connections resist radial thrust — not moment-fixed portal frames.

Internal Columns

4 king-post columns support the central ring — free-standing, not tied to perimeter rafters.

Fusion PEB Footing Standard

Base plate 25 mm · Gusset 16 mm · Cleat 6 mm · J-bolts 25 mm · Gr60 rebar · 3000/4000 psi concrete. 20 perimeter + 4 internal + 1 mast isolated footings.

Detailed GA drawings, footing & column/rafter schedules: see structural package (FD-STR-001).

FUSION DEVELOPERS
Building Envelope

Brick Base · Glazed Crown

0–10 ft · Brick Wall

Warm-brown masonry plinth, all around the 165 ft perimeter. Solid, grounded, acoustic.

10–20 ft · Glazed Band

Full-height glazing with gold mullions — daylight by day, glowing lantern by night.

Front elevation — round marquee, double-height lobby

FUSION DEVELOPERS
Materials & Finishes

Specification Board

MaterialSpecSupplierLeadEst. PKR
Structural SteelASTM A992 / A572 Gr50Mughal Steel6 wks
Rebar Gr60ASTM A615Amreli Steels3 wks265/kg
Brick / Masonry400×200×150Local2 wks25/nos
GlazingDouble-glazed, gold frameLocal fab5 wks
Marble (interior)Statuario / Beirut limestoneStone Hub8–12 wks3,800/m²
Finial / Gold trimPVD gold SSFusion PVD4 wks

Full 7-column board (maintenance, lifespan) in project BOQ pack.

FUSION DEVELOPERS
MEP Scope (Summary)

Services for a 21,000 sq ft Rotunda

Power

11 kV WAPDA incomer · 1,000 kVA transformer · 500 kVA standby generator (N+1) · UPS for AV.

HVAC

Conical-volume cooling — water-cooled chillers + AHUs + VRF; calculated for 1,500-occupant banquet load.

Plumbing & Fire

50,000 gal storage · booster pumps · NFPA 13 sprinkler + NFPA 20 pumps + addressable alarm.

ELV

CCTV (Hikvision) · access control (Genetec) · PA/BGM · AV (L-Acoustics) · BMS (Siemens).

FUSION DEVELOPERS
Construction Program

Indicative 14-Month Schedule

PhaseDurationKey Milestone
Mobilization & ApprovalsMonth 1LDA NOC, utility apps
Excavation & FootingsM2–425 isolated footings
Columns & Radial FrameM4–824 cols + 20 rafters + ring
Roof & EnvelopeM8–10Conical roof, brick + glazing
MEP & FinishesM10–13Services, interiors
Testing & HandoverM13–14T&C, Civil Defense, ISO
FUSION DEVELOPERS
Indicative Cost (PKR)

BOQ Summary by CSI Division

DivisionIndicative %Note
03 Concrete / 04 Masonry20%Footings, brick plinth
05 Metals (Steel Frame)18%Radial frame, ring, mast
08 Openings / Glazing12%Glass band, entrances
09 Finishes15%Marble, drapery, ceiling
22/23/26 MEP25%Power, HVAC, plumbing, fire
Prelim / Contingency10%OH&P, 10% prov.

Provisional breakdown for budgeting only — firm BOQ issued after design freeze. Fusion rate basis: CSR Punjab + field-verified supplier rates.

FUSION DEVELOPERS
Furniture & FF&E — Fusion Home Store

Banquet-Grade Interiors

Rose-Gold Banquet Chair — Nishat

Solstice Rose-Gold Chair

Round Spiral Cocktail Table

Maze CNC Lounge Sofa

Strip Bar Chair

Penta Console — foyer

Marquee FF&E Scope

1,500-banquet setup: gold/rose-gold chiavari chairs, round 66" banquet tables, stage & dais, lounge clusters, bar stools, console pieces — all PVD gold finished to match the venue palette.

Sourced From

Fusion Home Store (fusion-store.pages.dev) — 142 furniture items, PVD-coated & bespoke. Quoted separately as client-direct FF&E package.

Furniture shown: live Fusion Home Store catalogue. FF&E supplied as a separate schedule; not included in the structural/civil BOQ.

FUSION DEVELOPERS
Why Fusion

Delivered to a World-Class Gate

End-to-End

Architecture → Engineering → Construction → Handover under one roof.

QA Gate

Every drawing re-checked by independent free-LLM council + Senior Architect sign-off (FD-ARCH-SR-001).

Field-Verified

Rates and quantities grounded in PK market data, not theory.

Fusion Developers (Pvt) Ltd · Lahore · www.fusiondevelopers.pk · info@fusiondevelopers.pk

FUSION DEVELOPERS
Approval & Next Steps

Sign-Off & Way Forward

FD-ARCH-SR-001 Verification Certificate

This proposal's geometry is verified against the client brief:

Round Ø165 ft plan   20 perimeter + 4 internal columns + central mast
20 radial rafters to 35 ft apex   Eave 20 ft / Apex 35 ft
Brick base + glazed crown   Radial-frame (not portal PEB)

Verified by: Arif Hussain — FD-ARCH-001 (Senior Architect, Fusion Developers)
Date: August 2026  ·  Signature: _______________

Next: design freeze → firm BOQ → contract → mobilization.